Notes on the Section view

image2 e1401842912479 300x263 Notes on the Section view

Dome section

Have a look at the rubble trench in detail later. There are some shots in the “building” drop down as well. There is a 4″ drain in the trench draining to daylight, which also happens to be next door? Anyway, we have had severe rain since installation and it took care of it very well.
The first 3 feet above the foundation bags are vertical.  Road base filled. Very nice. No corbel. This starts  above this datum.
This is a big deal inside the dome for comfort in the kitchen etc. All cupboards and fittings will have to be be custom made to fit in with the corbelling.
We placed a nice peeled aromatic cedar log at about loft height for kitchen utensils and general appearance.

You can use this plan section to loft out the bag row heights and radii if you wish. In general the bags are tamped 6″ deep anyway and the corbel is about 3″ a row as a double check. The radius compass worked very well for this. We later filled the bags a lot heavier and got about 8″ thick. 

 

Share and Enjoy

  • wp socializer sprite mask 32px Notes on the Section view
  • wp socializer sprite mask 32px Notes on the Section view
  • wp socializer sprite mask 32px Notes on the Section view
  • wp socializer sprite mask 32px Notes on the Section view
  • wp socializer sprite mask 32px Notes on the Section view
  • wp socializer sprite mask 32px Notes on the Section view
  • wp socializer sprite mask 32px Notes on the Section view
  • wp socializer sprite mask 32px Notes on the Section view

Leave a Reply

Your email address will not be published. Required fields are marked *